Quick answer: Unit2Go's 2026 range starts at $26,995 for a backyard office studio and $76,995 for a studio with its own bathroom, rising to $259,995 for a three bedroom family home. Two bedroom homes start at $149,995. On top of the home price, budget for delivery and placement, site work, service connections, consents and any extras. Every model can be bought with in-house finance over 8 or 10 years.
With the cost of a conventional new build in New Zealand continuing to climb, a transportable tiny home remains one of the most affordable paths to extra space or home ownership. Because homes are built off-site, the price is known up front and you avoid many of the delays and cost blowouts of a traditional build. This guide covers every cost involved, so you can plan for the full installed price rather than just the sticker price.
1. The home itself: 2026 prices
| Model | Size | Layout | Price* |
|---|---|---|---|
| 10S Backyard Office Studio | 11.4sqm | Open plan office, not self-contained | $26,995 |
| 15S Open Plan Studio | 15sqm | Open plan with private bathroom | $76,995 |
| 20S Self-Contained Studio | 20.4sqm | Studio with kitchen and bathroom | $86,995 |
| 25S Compact One Bedroom Cabin | 26.4sqm | 1 bedroom | $94,995 |
| 30S Spacious One Bedroom Cabin | 32.4sqm | 1 bedroom | $114,995 |
| 40S Compact Two Bedroom Cabin | 40.24sqm | 2 bedrooms | $149,995 |
| 50SE Two Bedroom Cabin Special Edition | 50.19sqm | 2 bedrooms | $189,995 |
| The Accessible Two Bedroom Home | See model page | 2 bedrooms | $199,995 |
| 60C Three Bedroom Family Cabin | 60.43sqm | 3 bedrooms | $229,995 |
| 70G Three Bedroom Premium Tiny Home | 69.96sqm | 3 bedrooms | $259,995 |
*Prices as listed in November 2026, ex-factory. Check each model's page for current pricing and specials.
The home price covers the building itself, fully built and finished in our yard, including the features listed on each model's page. Optional extras such as a heat pump, dishwasher, French doors or stone benchtops are added on top.
2. Delivery and placement
Unit2Go delivers across the North Island with our own team, truck and trailer. At the time of writing, delivery starts from a minimum charge of $750 for narrow 2.4m-wide units on an average install, while wider and longer homes are quoted for your site. Costs rise with distance and difficult access. A digger can be used to manoeuvre a home into tight spots, homes over 10m long need a larger machine on site, and a crane lift over a house or fence is an extra cost.
3. Site work
Your home needs a level, stable base. On a reasonably flat site it can simply be blocked level on arrival, which keeps costs low. Sloped or soft ground may need piles or earthworks. Groundworks are the owner's responsibility, but we can arrange them for you if you prefer.
4. Services and connections
Budget for connecting power, water and wastewater, plus internet if you need it. These costs depend mostly on how far the home sits from existing services. On rural sites without mains water or sewage, allow for tank water and a septic or alternative wastewater system, which can be one of the larger items in a rural budget. A Saniflo system is an option where the home sits away from existing drainage.
5. Consents and council fees
Each council has its own rules, so check what your site needs early. Under New Zealand's 2026 granny flat rules, some standalone homes up to 70sqm can be placed without a standard building consent if you notify your council and meet the Building Code, which can reduce costs. District plan rules still apply, and some sites will still need resource or building consent. See our granny flats and new consent rules page for more.
6. Setup and extras
Don't forget decking and steps, landscaping, furniture, and any carport or storage you want to add. If you plan to rent the home, allow for meeting the Healthy Homes Standards.
Where will it go?
You will also need somewhere to site your home. You might have family land you can use, lease part of someone else's property, or buy a section with a view to building something larger later. Whichever route you take, check your council's rules on secondary dwellings before you commit to a site. A site assessment is the easiest way to get a reliable estimate of delivery, site work and connection costs.
A Beginner's Guide to Financing Your Transportable Home
For most families, the question is not just what a home costs but how to pay for it. There are four main pathways in New Zealand, and many buyers combine more than one.
1. Unit2Go in-house finance
Every home in our range can be bought on Unit2Go finance, with terms of 8 or 10 years and a weekly repayment. Instead of a 30-year mortgage, you own the home outright at the end of the term, and on many models the weekly cost is comparable to renting. Minimum deposits vary by model, with smaller homes needing a much smaller deposit than our larger three bedroom homes. The current weekly payment, term, interest rate and minimum deposit are shown on each model's page, and you can start with our online finance application.
2. Bank lending
Some banks will lend on a transportable home, particularly where it will be permanently sited on land you own. Others are more cautious about prefabricated or relocatable buildings, so check your bank's policy before you commit. Having a council-consented home and a clear site plan makes that conversation easier.
3. Cash or savings
Because transportable homes cost far less than a conventional build, some buyers can pay cash or use savings, particularly for smaller units like a studio or one bedroom cabin. See our cash sale options.
4. Renting first
If you are not ready to buy, renting a unit through our rentals service lets you get extra space now and decide on ownership later.
How to compare your options
Compare the total cost over the life of the loan, not just the weekly payment. A shorter term costs more each week but less overall, while a larger deposit lowers both. Remember that delivery, site work, services and consents need to be covered too, either from savings or as part of your overall budget.
Frequently Asked Questions
How much does a tiny home cost in New Zealand?
Unit2Go's 2026 range runs from $26,995 for a backyard office studio to $259,995 for a three bedroom family home. Self-contained homes start at $86,995 for the 20S studio. Add delivery, site work, service connections and consents to get the full installed cost.
How much does a 2 bedroom transportable home cost in NZ?
Unit2Go's two bedroom homes start at $149,995 for the 40S Compact Two Bedroom Cabin (40.24sqm). The 50SE Two Bedroom Cabin Special Edition is $189,995 and the Accessible Two Bedroom Home is $199,995. Add delivery, site work, connections and any consent costs for the full installed price.
What is the cheapest self-contained tiny home?
The 20S Self-Contained Studio at $86,995 is our most affordable option with its own kitchen and bathroom. The 15S Open Plan Studio at $76,995 has a private bathroom and space for a small fridge and microwave.
Can I get finance for a transportable home?
Yes. Unit2Go offers in-house finance on every model, with 8 or 10 year terms, weekly repayments and minimum deposits that vary by model. Some banks also lend on transportable homes, though policies vary, so check with your bank early if you would rather use a traditional loan.
Related guides
- Best Affordable Tiny Homes in New Zealand for Families
- A Beginner's Guide to Long Cabins in NZ: Costs, Durability and Delivery
- Portable Cabins and Tiny Homes for Farm Stays, Airbnb and Family Income
- Transportable Homes for First Home Buyers
- SIP panels vs timber frame: how we build
Last updated: November 2026